1. For each Hut-specific project the following work products (new or modified) must be delivered: 针对每个Hut专属项目,必须交付以下工作成果(新创建或修改后的版本)
- Controlling plan of each hut project based on the platform safety plan. 基于平台安全计划的各小组项目控制方案
- Impact analysis report of each hut project. 每个小组项目的影响分析报告
- Item definition of the light, OTA and Body functions. 灯光、 OTA 及真扯功能项定义
- Hazard analysis and risk assessment of each item in layer3 scope. L3范围内各项内容的危害分析与风险评估
- Functional safety concept for light, OTA and body functions. 针对灯光、 OTA 及整车功能的功能安全概念
- Technical safety concept for light, OTA and CDCU relevant scope. 适用于灯光、 OTA 及 CDCU 相关领域的技术安全概念
- Verification report of all functional safety work products. 所有功能安全工作成果的验证报告
- I3 confirmation report of functional safety work products according to the ISO26262/GBT34590. 根据ISO 26262/GBT 34590标准编制的功能安全工作成果I3确认报告
- Integration and test strategy/plan for light, OTA and body functions. 针...