Review tasks with Foreman to ensure adequate approach and construction methods.
Generating survey notes and record keeping of grades and layout established in the field. Providing complete as-built/redline drawings throughout the progression of the job.
Works directly with all site employees and indirectly with the Operations Dept as part of a collaborative team-based culture.
Establish construction layout and grade for all utilities based on the stake layout provided by the Surveyor.
Take part in site layout with surveyor, offset and transfer layout information to offset stakes and/or protect layout, and understand layout provided.
Clearly communicate with all members of the crew to ensure that all utilities are installed in their correct location.
Accurately record all as-built information into the field book, and transfer the information onto the project record drawings.