Design WSC (Water Steam cycle), select plant configuration and main equipment such as boiler, steam turbine, condenser (Thermal plant) and GT, HRSG, STG and condenser in case of CCPP
Prepare Heat and Mass balance diagrams (HMBD) and Water Balance Diagrams (WBD)
Prepare PFDs and P&IDs including KKS numbering
Provide process inputs to piping and I&C
Perform calculations involving sizing of equipment, pressure drop calculations, heat rate calculations and other required process calculations
Prepare Design Manual, System description and control philosophy document
Prepare plant start- up curves and plant operation philosophy
Prepare technical specifications, evaluate vendor offers and select vendors for GT, HRSG, STG, Condenser for CCPP
Prepare technical specifications, evaluate vendor offers and select vendors for Boiler (PC/CFB), Flue gas treatment (ESP, Bag house), Fans, STG...